The Festival Flyer, in full flight up to the Abbey to pick up a full load of passengers.
Saturday, 10 July 2010
Kirkstall Festival
As usual, we operated today to take passengers to and from Kirkstall Festival. This is usually our busiest day of the year, and today did not disapoint, with many fully loaded trains. Atlas and Little Ruston were used on the 'Festival Flyer', both running well all day.
The Festival Flyer, in full flight up to the Abbey to pick up a full load of passengers.
The Baguley has been inspected to see what was wrong with it's engine (after it stopped working when it derailed on Thursday) Turns out whatever it was has sorted itself out, and the engine started straight away.
The Festival Flyer, in full flight up to the Abbey to pick up a full load of passengers.
Thursday, 8 July 2010
7mm society visit
This evening we had the 7mm scale society (narrow gauge railway modellers) visiting. We had all our working engines outside for photographing, and many of them started and on the passenger train.



The Gogo tractor made another sucessful run up the line and back, crawling backwards in reverse gear took over 5 minutes.


The Gogo tractor made another sucessful run up the line and back, crawling backwards in reverse gear took over 5 minutes.
I think our visitors enjoyed their visit, despite a moment when the Baguley decided it didn't like being a train any more and made a bid for freedom, landing at 45 degrees to the track! It doesn't look like its suffered any significant damage, but we couldn't get the engine to restart, so will have to have an in depth look at it at the weekend.
Also, a photographer from the Yorkshire Evening Post turned up. Peter (the owner and driving force behind the railway) is going to be interviewed on Saturday for an article in the newspaper. So a few minutes were spent gathered 'twixt the Gogo and Baguley for team photographs (...is the YEP a broad-sheet? It might need to be for some people in the photo :-D )
So everyone look out in the YEP in the near future.
Monday, 5 July 2010
The beginning of the end....
...well, for me at least. I'm moving to Devon, so after next weekend my visits to the railway will be only occasional. If people send me photos and descriptions of whats being going on then this blog might be able to continue via 'remote control'. ...we'll see.
Anyway, today I was using Odin, which ran well all day. Passengers were a steady stream, it was one of those days when we're never stood still for long, but theres never a decent load on the train.
Next weekend, we'll also be operating on Saturday, as it is Kirkstall Festival in the Abbey grounds.
Anyway, today I was using Odin, which ran well all day. Passengers were a steady stream, it was one of those days when we're never stood still for long, but theres never a decent load on the train.
A strange thing has happend while I've been away. Somebody has spray painted the handle of one of our point levers yellow. Its been done quite intentionally, yet there is no other yellow paint or vandalism of any kind to be seen. odd.
Sunday, 4 July 2010
The past few weeks...
...I havn't been at the railway, but Justin sent me these pics of what was running.
20th June, Little Ruston was in action on the passenger train.

The Gogo tractor was out and running, with my Dad at the 'wheel'.
27th June, the turn of Atlas again, seen here shunting the Muir Hill chassis out of the compound.
20th June, Little Ruston was in action on the passenger train.
The Gogo tractor was out and running, with my Dad at the 'wheel'.
Sunday, 13 June 2010
Today's engine was Atlas, which ran well. There were not too many passengers, but enough to make it worthwhile running. The hot axlebox changed last week seems to be ok now.
Later on in the afternoon, the heavens opened and we packed away early, but driving no-cabbed Atlas in the pouring rain is about as much fun as you'd imagine it to be...
I also changed a sleeper. turned out to be quite rotton under the surface.

The Gogo tractor came out of the shed today to be measured and photographed for a model.
Later on in the afternoon, the heavens opened and we packed away early, but driving no-cabbed Atlas in the pouring rain is about as much fun as you'd imagine it to be...
The Gogo tractor came out of the shed today to be measured and photographed for a model.
Sunday, 6 June 2010
More pics from Leeds traction engine club visit.
Some more photos from last month when the Leeds and district traction engine club visited to have a hog roast, sent to me by Justin.
Here is the steam roller that turned up, nicely rolling our yard flat.
Some steam roller detail. It really was well turned out.
Here is the steam roller that turned up, nicely rolling our yard flat.
Today it was pouring down with rain, so we didn't rush about getting the train out, as there simply was nobody about. at about 2 'o'clock the rain eased, and some trains were ran. Druid was the motive power, and ran without faults.
Last Monday Atlas suffered a hot axlebox. Today we set about fixing it. This involved jacking and packing up the front end of the loco and removing all of the axlebox seen below. What had happened is the springs that hold a lubricating pad against the bottom of the axle had broken with age. Luckily, we had a brand new one to hand and the axlebox was cleaned out and the replacement fitted. We put Atlas on the passenger train at the end of the day and it seems OK now. It still runs a little warmer then the other 3 axleboxes, but apparently this is not a problem and is because of some water damage to the end of ther axle from when it was stored out of use at Alne tile works.

Atlas on the top end of the passenger train. It got fixed quickley because it is such a good, useful and powerful engine. It hauls the passenger train even with Druid on the rear end as though theres nothing there. It could just do with a cab on wet days like today though.
We didn't take many passengers today, as the weather was so bad. But we did take some so it was worth running.
Meanwhile, the O&K progresses. The front body section has been removed to aid the refitting of the engine oil level filler/indicator.

The new gearbox sump has recieved it's first coat of paint, and for the first time looks like part of the locomotive. It only need a small modification (i'm told) before it is complete. Then the axlebox wants taking apart and cleaning of debris from the building of the sump, and the whole thing can be assembled for good.
Atlas on the top end of the passenger train. It got fixed quickley because it is such a good, useful and powerful engine. It hauls the passenger train even with Druid on the rear end as though theres nothing there. It could just do with a cab on wet days like today though.
Meanwhile, the O&K progresses. The front body section has been removed to aid the refitting of the engine oil level filler/indicator.
The new gearbox sump has recieved it's first coat of paint, and for the first time looks like part of the locomotive. It only need a small modification (i'm told) before it is complete. Then the axlebox wants taking apart and cleaning of debris from the building of the sump, and the whole thing can be assembled for good.
Subscribe to:
Posts (Atom)
